Advance decisions, not just documents
A concert advance connects the tour’s requirements with the venue’s actual plan for a date. Sending a rider starts that conversation; it does not finish it. Work through the information in groups, record the response, and distinguish a request from an agreement.
Give each subject an owner on both sides where practical. One person can coordinate the advance without being the source of every answer. Separate confirmed facts from assumptions so the day sheet does not inherit unresolved questions as fixed instructions.
Reusable advance checklist
Keep the checklist in a shared working document or record with a status column. For each item, capture the latest answer, who supplied it, when it was received, and what action remains. This makes follow-up specific rather than another broad request to “confirm everything.”
- Date, venue name, address, and primary advancing contact.
- Arrival windows, access point, parking contact, and unloading coordination.
- Proposed production schedule, artist call, doors, and performance times.
- Current stage plot, input list, backline requests, and document versions.
- Dressing rooms, meals, hospitality contact, and runner requests.
- Guest allocations, submission cutoff, and box office contact.
- Outstanding decisions, responsible person, and reply deadline.
Sample: resolving a scheduling conflict
Sample: the tour proposes a 15:00 soundcheck, but the venue has another activity in the room until 15:30. Instead of leaving both times in different documents, the production leads agree on a revised sequence: setup coordination at 15:30 and soundcheck at 16:15, subject to their confirmation.
The coordinator records the agreed change, updates the day sheet, and checks whether the artist’s transport still fits. That last step matters: a resolved production question can create a new travel question. Link the decisions rather than treating each checklist row as isolated.
Common mistake: forwarding attachments without checking versions
A common mistake is resending the rider while an older stage plot remains attached elsewhere. Name the current documents in the advance summary and remove superseded copies from the active packet. If something changes, explain what changed and who needs to respond. A new filename alone does not tell the recipient what to do.
Next action
Start with the next unadvanced date. Group its unanswered questions by the person who can resolve them, send one concise request to each, and set a review point. When the answers arrive, close the loop by issuing a short confirmed summary. Carry unresolved items forward visibly rather than calling the advance complete because an email was sent.